譯雅馨10年翻譯品牌,20000家企業(yè)見證的深圳翻譯公司
文件翻譯

文件翻譯

10年專業(yè)筆譯品牌?

陪同翻譯

陪同翻譯

10年數(shù)萬場口譯

證件翻譯

證件翻譯

專業(yè)留學(xué)移民翻譯

本地化翻譯

本地化翻譯

多語言網(wǎng)站翻譯

小語種翻譯

小語種翻譯

89種語言服務(wù)

當(dāng)前位置:主頁 > 翻譯案例庫

電梯翻譯-中英文對照

日期:2010-07-27 | 閱讀:
第三章 電梯導(dǎo)軌的安裝 Chapter 3 Installation of Elevator Guide Rail 注:圖中的G、C尺寸為布置圖上標(biāo)注的導(dǎo)軌端面間距加兩倍的導(dǎo)軌高加5~6mm間隙。 Note: The sizes of G and C in the diagram are the gui

第三章  電梯導(dǎo)軌的安裝
Chapter 3 Installation of Elevator Guide Rail
注:圖中的G、C尺寸為布置圖上標(biāo)注的導(dǎo)軌端面間距加兩倍的導(dǎo)軌高加5~6mm間隙。
Note: The sizes of G and C in the diagram are the guide rail end surface spacing labeled on the diagram + two times of guide rail height + 5-6mm clearance.
A:轎廂寬;B:轎廂深;C:對重導(dǎo)軌架距離;
D:轎廂架中心線與對重架中心線的距離;
A. Car width; B. Car depth; C. Counterweight guide rail bracket distance;
D. Distance between car frame center line and counterweight housing center line;
E:轎廂架中心線至轎底后沿尺寸;F:開門凈寬;
G:轎廂導(dǎo)軌距離;
1:鉛垂線;2:對重中心線;3:轎廂架中心線;
4:聯(lián)接鐵釘
E. Size from car frame center line to car platform back edge; F. Clear door width; G. Car guide distance;
1. Plumb line; 2. Counterweight center line; 3. Car frame center line; 4. Connection iron nail
注:建筑越高,木板的厚度應(yīng)相應(yīng)加大,或者用角鋼制作
Note: The thickness of wood board shall be subject to the height increase of the wood board, or fabricated with angle iron.
3.1制作樣板架:
根據(jù)本電梯布置圖上注明的尺寸用不易變形的干木料制成,四面刮平并要求絕對平直,必時亦可用角鋼制成,木板規(guī)格與建筑提升高度有關(guān),見下表:(樣板架平面示意圖見圖3-1)。
3.1 Fabrication of template frame:
The template frame is made of deformation-resistant dry timber according to the dimensions specified on the elevator layout drawing. The four sides should be stroke off and absolutely straight. If necessary, it can also be made of angle bar. The specification of wood board is correlative to architectural hoisting height. See the following table (refer to Diagram 3-1 for the plan sketch of template frame).
第四章 電梯機(jī)房承重梁的安裝
Chapter 4 Installation of Machine Supporting Beams in Elevator Machine Room
4.1承重梁的安裝應(yīng)符合下列要求:
4.1.1兩端埋入墻內(nèi)時,其埋入深度應(yīng)超過墻厚中心20毫米,且不應(yīng)小于75毫米(對磚墻,梁下應(yīng)墊以鋼筋混凝土梁,(見圖4-1));
4.1.2承重梁上平面(A面)的水平度誤差不應(yīng)超過1/1000,相鄰之間的高度允差2毫米。(見圖4-2)
4.1 The installation of machine supporting beams shall meet the following requirements:
4.1.1 When the two ends are embedded in the wall, the embedding depth shall be more than 20mm from wall thickness center and less than 75mm (as for brick wall, reinforced beam should be cushioned under the beams, see Diagram 4-1);
4.1.2 The horizontal error of the upper plane (A) of machine supporting beams shall not exceed 1/1000. The neighboring height tolerance is 2mm. (See Diagram 4-2)
圖4-1 承重梁的埋設(shè)           圖4-2 承重梁
  1:磚墻;2:混凝土;
  3:承重梁;4:過梁;
  5:墻中心線;
                               Diagram 4-2 machine supporting beams
Diagram 4-1 Embedding of machine supporting beams  
1. Brick wall; 2. Concrete;
3. Machine supporting beams; 4. Lintel;
5. Center line of wall
    承重梁必須按照布置圖的要求,轎廂中心位置安放正確,即對正樣板架中心,在井道兩面所需插入梁的墻上留孔或鑿孔,在機(jī)房樓板平面上最好在有承重梁安置的地方留一狹長孔洞,或者機(jī)房樓板不封頂待裝完承重梁后進(jìn)行封頂。
Machine supporting beams must comply with the layout drawing. The central position of lift car should be placed correctly, i.e. opposite to the center of template frame. Provide or punch holes on the wall inserted with beams at the two faces of hoistway. It is better to provide a long and narrow hole at the place where machine supporting beams are placed on the machine room slab plane, or the machine room slab is left uncapped and is so after installing machine supporting beams.
兩個緩沖器頂部和電梯轎廂架緩沖板之間的相對誤差為 e 2
The relative error between two buffer tops and elevator car frame buffer plate is e 2.
座筒部分每100mm
長度內(nèi)C-D ≤1mm
Every 100mm of the seat post part
Length C-D ≤1mm
5.1.5在采用彈簧緩沖器的情況下,彈簧緩沖器的安裝要保持垂直。
5.1.6緩沖器中心應(yīng)對準(zhǔn)轎架或?qū)χ氐木彌_座的中心,允差在20毫米以內(nèi)。
5.1.5 When spring buffer is adopted, its installation shall keep vertical.
5.1.6 The center of buffer shall be aligned with the center of car frame or counterweight buffer seat. The tolerance shall be within 20mm.
第五章 緩沖器的安裝
Chapter 5 Installation of Buffer
緩沖器的選用:
Selection of buffer:
緩沖器有彈簧緩沖器及液壓緩沖器兩種,且分為轎廂緩沖器和對重緩沖器,安裝在轎廂架和對重架下面的井道底坑內(nèi)。當(dāng)轎廂在超載10%并以限速器允許的最大速度下降時,緩沖器應(yīng)能承受相應(yīng)的沖擊。它是電梯的重要安全部件之一,根據(jù)電梯的速度進(jìn)行選用。
Buffer falls into spring buffer and hydraulic buffer, or car buffer and counterweight buffer, which are installed in the well pit under car frame and counterweight housing. When the lift car is descending with 10% overload and at the maximum speed allowed by speed governor, the buffer shall bear corresponding impact. It is an important safety part of elevator, and shall be selected as per the speed of elevator.
5.1.2轎廂下梁.對重蹲簧板至緩沖器的越程S1、S2應(yīng)符合表5-1的規(guī)定。或按電梯土建總體布置圖規(guī)定尺寸進(jìn)行施工。
5.1.2 Car frame plank. The overruns (S1, S2) from counterweight springboard to buffer shall be in conformity with Table 5-1, or constructed as per the specified dimensions of the overall civil engineering layout drawing.
表5-1 緩沖器的選用及越程
Table 5-1 Selection and overrun of buffer
電梯額定速度Rated speed of lift
緩沖器形式 Buffer type
液壓Hydraulic
彈簧spring
5.1.3液壓緩沖器的安裝要垂直。在活動柱塞的頂部和底部傾斜度不超過0.5毫米(即垂直度、歪斜A-B之差應(yīng)圖5-1b中的直以內(nèi))。
5.1.3 The installation of hydraulic buffer should be vertical. The inclination at the top and bottom of the movable plunger shall not exceed 0.5mm (i.e. the different of verticality and skewness A-B shall be within the value specified in Diagram 5-1b).
5.1.4在同一基礎(chǔ)上安裝兩個液壓緩沖器時其水平誤差不超過2毫米(圖5-1c)。
5.1.4 When two hydraulic buffers are installed on the same base, the horizontal error shall not exceed 2mm (Diagram 5-1c).
第六章 對重裝置安裝
Chapter 6 Installation of Counterweight Device
6.1在對重導(dǎo)軌的中心處由底坑起約5~6米高的地方懸吊一個牢固的環(huán)鏈?zhǔn)掷J,用其將對重架吊起。
6.2根據(jù)不同底坑深度及轎廂下梁和緩沖器計算轎廂和對重碰緩沖器的行程S
   即  S=P-(A+B)──轎廂和對重碰緩沖器的行程
      H=S+C──對重距離底坑深度
      P──底坑深度
      A──轎廂門坎平面至下梁碰板的距離
      B、C──緩沖器頂面至底坑底平面的距離。
6.1 A firm chain block is hung 5-6 meters above the pit at the center of counterweight guide rail to sling counterweight housing.
6.2 Calculate the stroke(S) of car buffer and counterweight buffer according to different pit depths and car frame plank and buffer
i.e. S= P-(A+B)──stroke of car buffer and counterweight buffer
     H=S+C──counterweight distance pit depth
     P──Pit depth
A──Distance from car threshold plane to plank bumping board
B, C──Distance from buffer top to pit base plane.
      
圖6-1 對重裝置定位計算圖
Diagram 6-1 Position calculation diagram for counterweight device
6.3 根據(jù)計算出的距離將對重架吊起至所需高度用木楞支好,將兩邊上、下導(dǎo)靴裝好。調(diào)整導(dǎo)靴與導(dǎo)軌的吻合,保證能自由上、下滑動,不得有偏斜或者有切割導(dǎo)軌現(xiàn)象。如用滑動的死導(dǎo)靴,則導(dǎo)靴內(nèi)頂面與導(dǎo)軌頂面間之間隙調(diào)整至2毫米,然后將平衡鐵由下而上地裝到對重架內(nèi)。
  對重裝置總重=轎廂總重量+40~50%額定載荷。
6.4 對于有動滑輪的對重裝置同時把滑輪裝好。
6.5 當(dāng)對重平衡鐵裝到所需重量后,把對重架兩側(cè)立柱定位角鐵與立柱配鉆后用螺栓牢固住,以免在正常運(yùn)行中發(fā)出碰撞之聲。
6.3 Sling the counterweight housing according to the calculated distance up to the required height and set it up with wood shuttle. Install the top and bottom guide shoe at the two sides. Adjust the guide shoe to coincide with the guide rail, ensuring it can slide freely upwards and downwards without deviation or cutting guide rail. In case of using slideable dead guide shoe, adjust the clearance between the inner top surface and top surface of guide rail to be 2mm, and then install balance iron from bottom to top into the counterweight housing.
Total weight of counterweight device=total weight of lift car+40-50% rated load.
6.4 As for counterweight devices with a fall block, the fall block should be installed at the same time.
6.5 When the counterweight balance iron is up to the required weight, drill the upright positioning angle iron at the two sides of the counterweight housing with the upright and fix them with bolts, so as not to cause impact sound during normal operation.
6.6安裝簡單方法如下:
   將轎廂內(nèi)多余物品拿出轎廂,按額定載荷的40%的重物加入轎廂(如額定載荷1000kg時為400kg),電梯從一樓往頂樓上行,到行程的中間位置時,記錄電流值;再將電梯從頂樓往一樓,運(yùn)行到中間位置時,記錄電流值。再加載到45%,按前述運(yùn)行,并記錄電流值;在做完50%的額定載荷后,根據(jù)所記錄的電流值,在平衡系數(shù)測試坐標(biāo)上畫出上、下行的二條電流曲線,其交點應(yīng)在40%--50%之間。
6.6 The simple methods for installation are as follows:
Take superfluous objects out of lift car, put in 40% weight to the lift car as per rated load (400 kg when the rated load is 1000kg), and record current value when the elevator travels to the halfway from the first floor to the top floor; record current value when the elevator travels to the halfway from the top floor to the first floor. Put in 45% weight to the lift car and operate the elevator as per the aforesaid procure to record current value; when it is up to 50% of the rated load, draw up two current curves for ascending and descending on the balance coefficient coordinate, and the point of intersection shall be within 40%-50%.
6.7對重如沒有安全鉗裝置的,應(yīng)在未進(jìn)入井道前將有關(guān)零件裝妥。
6.7 Where the counterweight device has no safety gear, relevant parts should be installed before entering hoistway.

 

在線預(yù)約,獲取專屬優(yōu)惠報價
您的姓名
您的電話
翻譯類別
在線咨詢
與我們?nèi)〉寐?lián)系
電話咨詢
免費(fèi)熱線:18038126442
關(guān)注微信
返回頂部